Southern Link Road and Culvert
Dartford, London

Construction of a new access road, culvert bridge, and diverted utilities to reconnect previously separated industrial plots near the River Thames.

Client: Private Developer

cost

Confidential

duration

18 Months

Project Management
Cost Management
Employer's Agent

The Opportunity

TPI was appointed to manage the construction of a new road and culverted bridge to connect two operational sites previously cut off from the wider estate by the Stonehouse Ditch. The works enabled vehicle access across previously inaccessible land near the Dartford Crossing. Key elements included diverting two major water mains and electrical services, constructing a culverted crossing, and replacing a damaged foul drain running beneath the live C2C railway line.

The Challenges

Delivering infrastructure in a live rail and river environment required extensive planning and permissions. TPI secured pre-commencement approvals from the Local Planning Authority, Asset Protection Agreements from Network Rail, and permits from the Environment Agency due to proximity to a main river. TPI also managed detailed survey works, including topographical and trackside asset surveys, to enable safe construction around complex infrastructure and utilities.

The Outcome

Completed in Autumn 2021, the works successfully reconnected key operational areas, providing critical access across previously separated land. The completed link road and culvert now support the long-term development and flexibility of the site, enabling future industrial and port-related growth.